EXECUTIVE SUMMARY
PURPOSE OF REPORT
The Bellingham Department of Public Works is interested in taking a
measured, proactive approach to plan the future development of the Town of
Bellingham water supply and distribution system. The purpose of this report is to update the previous water system
master plan and to serve as a guide for future planning to provide a safe and
reliable water supply throughout the Town of Bellingham.
This report will review the existing public water supply system,
existing and future requirements, and the ability of the water system to expand
in a cost effective manner. Supply
alternatives will be evaluated and short-term and long-term supply development
plans will be recommended. The report
will examine the distribution system and how it can be developed while providing
adequate flows and pressures, constructing new storage facilities, implementing
new water supply sources and to provide a continuous
supply of clean water.
The sections in this Executive Summary correspond to detailed sections
in this report. The Executive Summary
is a condensed version of the entire Water System Master Plan.
SUMMARY OF REPORT CONCLUSIONS
SECTION 1 - EXISTING SYSTEM
1.1_
The water
supplies include 9 (nine) pumping stations rated for the corresponding pumping
capacity in gallons per minute (gpm):
PS #1 360
g.p.m.
PS #2 225
g.p.m.
PS #3 475
g.p.m.
PS #4 450 g.p.m.
PS #5 200
g.p.m.
PS #7 295
g.p.m.
PS #8 470
g.p.m.
PS #11 250 g.p.m.
PS #12 350 g.p.m.
1.2_
All wells,
except for PS #7 and #8, are treated with lime for corrosion control. In addition to lime, PS #7 and #8, are treated
with alum, potassium permanganate, sodium hypochlorite, and greensand
filtration.
1.3_
The
distribution system consists of 89.4 miles of pipe. Depending on year of installation, the pipe materials are unlined
or lined cast iron, asbestos-cement, steel, PVC, or cement-lined ductile iron. Currently the Department of Public Works
specifies and installs C900 PVC pipe in
roadways and Class 52 ductile iron concrete lined pipe in off road areas and
easements.
1.4_
Storage
facilities consist of the following three tanks, all with overflow elevations
of 457 ft.
·
Grove Street
Standpipe - 3.1 million gallon standpipe at a ground elevation of 327 feet.
·
Chestnut Street
Standpipe - 1.5 million gallon elevated standpipe with a ground elevation of
347 feet.
·
South Main
Street Standpipe - 0.5 million gallon standpipe at a ground elevation of 357
feet.
SECTION 2 - WATER
SUPPLY REQUIREMENTS
2.1 Average
day demand has fluctuated from 1.66 Million Gallons per Day (MGD) in 1992 to
1.37 MGD in 2000. Maximum day demand
has fluctuated from 2.89 MGD in 1992 to 2.09 MGD in 2000.
2.2 Unaccounted
for water, as presented in the Annual Statistical Reports, has ranged from a
high of 45% in 1994 down to a low of 20% in 2000.
2.3 Per-service
consumption has ranged from 403 gallons per service per day (gpsd) to 274 gpsd
between 1992 and 2000. Over the past
five years the per-service consumption has averaged 281 gpsd.
2.4 Total
number of services has fluctuated from 4,878 in 1992 to 4,978 in 2000 due to
recently improved accounting practices.
2.5 Average
day demand is projected to be 2.16 MGD in 2005, increasing to 2.54 MGD in 2010.
2.6 Maximum
day demand is approximately 2.0 times the average day demand, and is estimated
to be 4.32 MGD in 2005, increasing to 5.07 MGD in 2010.
SECTION 3 -
ADEQUACY OF SUPPLY FACILITIES
3.1 The
wells have a reported combined Safe Yield of 3,075 g.p.m. (4.42 MGD).
3.2 With
all wells in service, the wells can provide maximum day demand through the year
2009.
3.3 With
the largest supply out of service (PS #7 & #8/treatment plant), the
remaining wells will not be able to provide maximum day demands by 2003.
3.4 Bellingham
is not currently developing any new sources.
However, PS #13 and #10, are two possible new sources. PS #13 is expected to provide 350 g.p.m. The
capacity of PS #10 is expected to be 250 gpm, based on a preliminary test
conducted in 1971.
3.5 The
water supplies currently are in compliance with all primary drinking water
standards as established by the EPA and the Massachusetts Department of
Environmental Protection. Secondary
standards for iron and/or manganese are currently exceeded at all other wells,
except for PS #12 and the PS #7 & #8 water treatment plant.
3.7 There
is not sufficient auxiliary power at the pumping stations to meet projected
maximum day demand through 2010.
Installation of, or provisions for,
auxiliary power shall be required by 2004.
SECTION 4 -
ADEQUACY OF EXISTING DISTRIBUTION SYSTEM
4.1 Hydraulic
analysis of the water distribution system has identified problems within the
distribution system. These problems
include low pressures in high elevation areas and lack of available flow in
dead-end water mains.
4.2 The
existing water distribution system was evaluated by a number of criteria. These criteria included system pressures,
pipe velocities, head losses, available fire flows, and age of piping.
4.3 Fire
hydrant flow tests were conducted at nineteen (19) locations throughout
Bellingham by ISO Commercial Risk Services, Inc. in May 1998. These tests indicated that at 10 of the 19
test sites, the system could not deliver the required fire flow.
4.4 The
water distribution system was evaluated by the use of a computer model. The model used for the hydraulic analysis in
this report was Cybernet Version 3.1 by Haestad Methods, Inc.
4.5 The
Bellingham water distribution serves elevation limits ranging from 187 feet to
361 feet.
4.6 The
water distribution system model was calibrated by performing flow tests at 17
locations throughout the Town of Bellingham, and adjusting hydraulic factors
such as C-values and pipe status until the model output flows were within 10
percent of the actual flow test values.
4.7 Hydraulic
analysis of the distribution was completed under Average Day, Maximum Day, and
Peak Hour Demands. The model was
simulated based on operational conditions of the distribution system during the
flow testing on October 24, 2000. Other
sets of operational conditions were also investigated in the hydraulic
analysis, including, but not limited to varied well and tank operational
settings.
4.8 Under most demand conditions, all distribution system criteria are met,
with the exception of fire flows.
Residential fire flows are not available at all locations within the
distribution system, and under Peak Hour Demands, low pressures are seen under
fire flow conditions as well.
4.9 Distribution storage facilities serve several functions within a
distribution system. The primary
function is to provide storage for fluctuations in the daily usage of water.
4.10 Proposed improvements to the water system were discussed and
analyzed. It was determined that if all
the recommended improvements are implemented, the distribution system will be
able to meet all hydraulic requirements in the areas of flow, head loss,
pressure, and pipe velocity.
RECOMMENDATIONS
SECTION 5 - SUPPLY IMPROVEMENTS
5.1 Water
supply improvements are recommended to increase supply capacity as required to
improve reliability and meet future demands.
5.2 The
water department should pursue testing and development of the future well sites
- PS #13 and PS #10.
5.3 The
Bellingham DPW should install auxiliary power facilities at PS #3, #4 &
#11, PS #1 & #2, and PS #12.
5.4 The
Bellingham DPW should consider the installation of auxiliary power facilities
at all future supply sites.
SECTION 6 -
DISTRIBUTION SYSTEM IMPROVEMENTS
6.1 Distribution
system improvements are recommended to:
·
Improve fire
flows
·
Replace
undersized water mains
·
Replace aging
unlined cast iron mains
·
Decrease the
number of dead ends
6.2 In
developing alternatives to eliminate deficiencies within the existing
distribution system, the future expansion and service requirements of the
distribution system must be considered.
6.3 In
order to improve flow and pressure deficiencies within the system, there are
several pipe installations and improvement projects which need to be
performed. Table 7-1 lists twenty
improvement projects with associated costs and the three with the highest
priority are listed as follows:
·
Replace the
6-inch water mains in Blackstone Street with 8-inch water mains in the South
Main Street area.
·
Install 3,200
linear feet of 12-inch water main in Mechanic Street from South Main Street to
Maple Street
·
Replace the old
10-inch cast iron water main in Center Street with 10,500 linear feet of new
12-inch water main.
6.4 The
existing water storage facilities were found to be in good overall shape. The only tank which requires some
maintenance is the Chestnut Street Tank.
Maintenance to be performed includes repairs to pitted interior tank
areas and repainting of the exterior of the tank.
6.5 Once improved, the water distribution system will meet virtually all
the hydraulic requirements for a distribution system in its current
configuration, thus two separate zones of high and low pressure are not deemed
necessary at this time.
6.6 A
complete SCADA system for centralized monitoring and control of the system’s
pump stations, treatment processes, and storage facilities is recommended for
installation.
SECTION 7 - MASTER
PLAN IMPLEMENTATION
7.1 Regular
water system operations and maintenance activities including water main
flushing and gate valve exercising are very effective in maintaining the full
capacity of the existing facilities.
7.2 Financing
of system improvements can be achieved using water rate increases,
grants/loans, system development charges, and betterments.
7.3 A
Capital Outlay Budget has been prepared recommending spending between $582,000
and $1,342,000 annually over the next ten years.